Built for the big jobs.
Construction programmes, demolitions, plant shutdowns, facility contracts and multi-site tenders — planned, resourced, recorded and invoiced by one licensed waste carrier, from survey to close-out.
Fleet on the road
| 4 | Skip trucks | Skip loaders for 2m³ to 11m³ skips |
|---|---|---|
| 1 | Mini skip truck | Tight sites, narrow access and townhouse complexes |
| 2 | Compactor trucks | Scheduled bin and compactable-waste empties |
| 1 | Bakkie & trailer | Bulk bags, small loads and site support |
- Every truck GPS-tracked
- 6 dedicated drivers
- Around 40 contract clients on fixed schedules
- Operating 7 days a week, 8am – 5pm
The right container for every stream.
Numbered containers, matched to the waste, the space on site and the swap frequency your programme needs.
Fit-outs, small trades, tight spaces. Up to 3 days hire as standard.
The workhorse for construction and refurbishment. Available across our full 30 km radius.
High-volume, lighter waste: strip-outs, packaging and general site waste.
Segregated streams and day-to-day waste, emptied on schedule by compactor truck.
Separating recyclables at source, collected with your scheduled service.
For commercial and industrial sites producing high volumes of compactable waste.
Five stages, one accountable team.
- 01Scope & site survey
We walk the site with your team: waste streams and estimated volumes per phase, access routes and turning space, safe container positions, working hours and site induction requirements. Hazardous waste is inspected and the compound analysed before we quote.
- 02Waste management plan
A written plan for your file: container mix per phase, swap and empty frequencies, segregation at source, how heavy waste and rubble are handled, and the licensed facilities each stream goes to. Priced per lift, per swap or as a fixed contract rate.
- 03Mobilisation
Numbered containers placed to the plan, site contacts and purchase-order numbers captured, and the schedule loaded into our job system so every service is planned, assigned to a truck and tracked.
- 04Scheduled service
Swaps, collections and empties on the agreed schedule, seven days a week. Every load is logged against a signed, numbered service note, the container number and your site — and the schedule flexes as your programme moves.
- 05Reporting & close-out
Service records for your project file, invoices referenced to your PO or a monthly statement, a final sweep of all containers on demobilisation, and the documents your auditor or principal contractor needs.
How each waste stream is handled.
| Waste stream | Typical source | Containers & method | Controls |
|---|---|---|---|
| General & mixed site waste | Construction, fit-outs, strip-outs | 6m³ or 11m³ skips on a scheduled swap | Container numbers and service notes logged per load |
| Rubble & heavy waste | Demolition, earthworks, concrete breaking | Smaller skips or more frequent swaps to stay within payload | Weight restrictions applied; confirmed on site survey |
| Compactable commercial waste | Retail centres, warehouses, offices | Bins and cages emptied by compactor truck | Fixed empty days on contract schedule |
| Recyclables | Packaging, pallets, cardboard, metals | On-site sorting, bulk bags and segregated containers | Separated at source for recycling |
| Garden & organic | Estates, landscaping, site clearance | Skips or bags, repurposed where possible | Kept separate from general waste |
| Hazardous waste | Industrial processes, shutdowns, contaminated material | Collected only after inspection and analysis of the compound | Handled to the analysis; taken to licensed facilities |
All waste is taken to licensed facilities. Prohibited items are agreed in the waste management plan before mobilisation.
Rough out your container plan.
Enter your expected waste and programme length for a first-pass plan. We confirm everything on the site survey.
Loose volume. Not sure? A 6m³ skip filled to the brim is 6 m³.Every load accounted for.
On large projects the paperwork matters as much as the trucks. Here is what sits behind every service.
- Signed, numbered service notesOne numbered book per truck. Each load is signed on site, so every lift can be traced to a date, a truck and a container.
- Numbered containers, tracked trucksWe know which container is on which site, and every truck in the fleet is GPS-tracked.
- Planned, scheduled, loggedYour schedule lives in our job system: each service is planned the day before, assigned to a truck and closed out with its service-note number.
- Licensed disposalWaste goes to licensed facilities. Hazardous waste is collected only after inspection and analysis.
- Purchase-order disciplinePO numbers captured at booking and carried onto invoices, per job or on a monthly statement.
Pricing that fits how projects are run.
Fixed contract rates
Agreed rates for your account, locked in for the contract term. Each contract client is priced to their own requirements.
Per lift or per swap
Simple unit rates for programmes where volumes move week to week. You pay for the service you use.
Statements & POs
Invoice per job or one monthly statement listing every service, referenced to your purchase orders.
Responding to your tender.
Send us the tender document or RFQ, with the bill of quantities if there is one. We’ll ask for a site visit where it matters, price to your schedule and return a compliant submission before the closing date.
Sectors we serve.
Tell us about the project.
The more we know, the sharper the price. Email tender documents to info@skorskips.co.za or call 081 242 0299.
